Dimension 9 of 10 · methodology v1.0

Track-record credibility

Is there evidence this has been deployed and survived contact with production?

Dimension
9 of 10
Requirements
5
Conformance gate
No
Applies to
All categories
References
0
Methodology
v1.0
In full

Requirements, evidence source, and references

This page is the citable form of this dimension — a finding elsewhere can link straight to the bar it was judged against.

09

Track-record credibility

5 requirements

Is there evidence this has been deployed and survived contact with production?

Requirements · 5
  • A named production deployment, rather than a pilot described in the abstract.

    • Whether the customer is named, or only a sector is.

    • Whether the deployment is production or an evaluation.

  • Published case studies contain actual data rather than only qualitative claims.

  • Partnership and ecosystem announcements are recorded as what they are, and never counted as deployment evidence.

  • How long the deployment has run and at what scale, where either is discoverable.

  • Publicly known incidents or defects affecting the cryptographic product, and how the vendor handled them.

Evidence sourcePublic claims audit.
Take the whole bar
Download .md
The ratings are not published yet

The criteria are public so you can judge the bar before anyone is measured against it.

If you are choosing between post-quantum suppliers, or you are one and want to know how you will be assessed, get in touch. We will tell you when there are results to read.

A vendor in the pool, or think you should be? Cooperation gets you advance notice of the criteria and a pre-publication window to correct factual errors. It does not buy a better result.